<p id="awurb"></p>
<big id="awurb"></big>

    <sub id="awurb"></sub>
    又大又粗又硬又爽黄毛少妇,国产免费踩踏调教视频,日韩中文亚洲欧美视频二,麻豆国产传媒精品视频,亚洲国产精品久久亚洲精品 ,国产999精品2卡3卡4卡,欧美xxxx欧美精品,午夜精品福利亚洲国产
    Muen
    News

    News

    Enterprise service provider

    location : Home > News > Technical information

    The bearing capacity of high-voltage inverter for external faults and the fault recovery time of equipment

    2023-05-20 13:35:30

    The influence of external fault on input side, such as bus voltage drop caused by external power grid fault, on the operation of high voltage inverter. A power plant unit in Guangdong Province once had such an accident: due to the transient fault of the external power grid, the auxiliary power bus voltage flickered and dropped, leading to the shutdown of the auxiliary frequency converter. Although the fault of the external power grid was removed quickly, the important auxiliary equipment driven by the frequency converter stopped, which led to the unit load rejection. Therefore, the re start function of instantaneous power failure should be a reliable guarantee to improve the bearing capacity of external fault of high-voltage inverter of auxiliary equipment of power plant.


    The influence of external faults on the output side, such as cable breakdown and short circuit, single-phase grounding or even phase to phase short-circuit fault on high-voltage inverter. The high-voltage inverter shall be equipped with single-phase grounding fault detection function, and set alarm or trip protection according to site conditions. According to statistics, there are about 20 sets of phase to phase short circuit fault caused by insulation damage of high-voltage motors in Guangdong Province every year. Although the relative probability is small, the impact of short-circuit current on the equipment of high-voltage inverter with extremely limited over-current capacity is huge, which may lead to serious fault of equipment damage. The bearing capacity and protection technology of high voltage inverter to output phase to phase short circuit is an important factor to be considered in equipment selection and equipment safety assurance.


    Equipment faults can be divided into two types: one is the fault that can be recovered instantly. Once the fault occurs, it can recover itself in a short time. The frequency conversion device with automatic speed tracking function can significantly improve the operation ability and reliability under such fault conditions. Some of the high-voltage inverters in Guangdong Province are frequently shut down when lightning strikes in thunderstorm season;


    The other is the recovery time of the device after permanent failure. The power unit modularization can replace the standby module in a short time, so that the equipment can resume operation in a short time.


    General purpose frequency converter


    label

    QR code

    The public,

    Mobile station
    The public, Mobile station

    Contact

    未標(biāo)題-8.png 0755-81719517
    未標(biāo)題-10.png0755-81719530 未標(biāo)題-11.pngamb@ambition.com.cn
    未標(biāo)題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

    Navigation

    Home          About

    Product      Case

    Solution      Service

    Job      News

    Contact          

    Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
    主站蜘蛛池模板: 亚洲欧美在线一区中文字幕| 亚洲香蕉网久久综合影视| 国产欧美日韩精品专区| 极品妇女扒开粉嫩小泬| 麻花传媒68xxx在线观看| 国产真实乱人偷精品人妻| 特级西西444ww大胆高清图片 | 欧美肥老太牲交大战| 亚洲精品一区二区三区福利| 人妻日韩精品中文字幕| 18禁黄无遮挡网站免费| 国产午夜福利视频在线| 狠狠色丁香婷婷综合尤物| 麻豆国产成人AV在线播放| 国产精品夜夜春夜夜爽久久小| 中文字幕成人精品久久不卡| 亚洲性色av性色在线观看| 亚洲欧洲日韩精品在线| 国产精品人妻一区二区高 | 国偷自产一区二区三区在线视频| 人妻无码av中文系列| 色94色欧美sute亚洲线路二| 亚洲精品国产品国语原创| 久久毛片少妇高潮| 九色综合狠狠综合久久| 色欲av亚洲情无码av蜜桃| 国产精品日本一区二区在线播放| 蜜桃视频一区二区在线观看| 少妇大叫太大太爽受不了| 国内精品自线一区二区三区| 台湾佬中文娱乐网址| 青青草国产精品免费观看| 少妇无套内射中出视频| 色翁荡熄又大又硬又粗又视频| 亚洲理论在线A中文字幕| 久久久综合香蕉尹人综合网| 熟妇人妻引诱中文字幕| 亚洲xxxx做受欧美| 天干天干天啪啪夜爽爽99| 久久亚洲精品国产精品婷婷| 亚洲男人第一av网站|